Before adopting the new platform, TKG Taekwang struggled with independent planning systems that forced a full system regeneration whenever a single production line required a change. This manual-heavy approach hindered the company’s ability to respond to urgent orders. MOZART 3.0 resolves these bottlenecks by enabling selective replanning, which targets only the affected production lines without disrupting the entire manufacturing schedule.
TKG Taekwang Accelerates Footwear Production with MOZART 3.0
Global footwear manufacturer TKG Taekwang has overhauled its production planning by deploying VMS Solutions’ MOZART 3.0. The transition from fragmented legacy systems to a centralized environment has yielded a fourfold increase in planning speed, allowing the company to manage complex, make-to-order manufacturing requirements across its international sites with unprecedented agility.

Beyond speed, the software simplifies the management of intricate footwear manufacturing rules. By replacing labor-intensive mapping processes with an intuitive interface, the system allows planners to visualize and refine production scenarios in real-time. These optimizations have cut manual workloads by more than 50 percent, providing the flexibility needed to balance site-specific constraints against global delivery commitments. TKG Taekwang now maintains a unified view of its worldwide network, ensuring that production capacity aligns precisely with shifting market demand.



Comments (0)
No comments yet. Be the first!